Knowing what to expect before, during and after installation makes the disruption easier to plan for — and far less stressful.
Before installation
Before the team arrives, the working area should be cleared and access arranged. Existing cabinetry is removed where applicable, and the walls, floors and services are checked and prepared. Plumbing and electrical points are set to suit the new layout.
During installation
The factory-built carcasses and components are brought in and fitted. Doors and certain final finishes are fitted on site to protect finished surfaces during transport and installation. The team coordinates with the plumber and electrician so that points land where the cabinetry expects them.
Expect some dust, noise and limited use of the kitchen during this stage. A clear, accessible working area helps the installation run smoothly.
After installation
The countertop is templated and fitted once the cabinets are in. Final adjustments, finishing details and checks are completed, and the kitchen is handed over ready to use.
Frequently asked questions
Will I be without a kitchen for the whole renovation?
You'll be without a working kitchen during the installation, countertop and finishing stages. Planning a temporary food prep area in advance makes this period far easier.
Do you remove the old kitchen?
Removal of existing cabinetry is coordinated where applicable. Mention it early so it's planned into the sequence rather than left to the day.