How Long Does a Kitchen Renovation Take?

A kitchen renovation moves through several stages. The timeline depends on size, finishes and trade coordination.

A kitchen renovation isn't a single event but a sequence of stages — consultation, measurement, planning, quotation, manufacturing, site preparation, cabinetry installation, countertops, service coordination and final adjustments. Each takes its own time, and most run in a particular order rather than all at once.

From consultation to quotation

The project starts with a consultation to understand the space, your needs and your style. The space is then measured and the cabinetry layout and finishes are developed. Only once those are agreed is a detailed quotation prepared.

This planning stage depends mostly on how quickly decisions are made. Choosing materials, finishes and appliances early keeps it moving.

Manufacturing and site preparation

Once the design and finishes are confirmed, the cabinetry is manufactured in our factory. While that happens, the site is prepared: existing cabinetry is removed where needed, walls and floors are checked, and plumbing and electrical points are set to suit the new layout.

Manufacturing time depends on the size and complexity of the kitchen and the finishes chosen, so it is best discussed against your specific design rather than quoted as a fixed number.

Installation, countertops and handover

Cabinetry is installed on site, the countertop is templated and fitted after the cabinets are in, and final adjustments are made. Countertops often follow the cabinetry because they are templated to the installed cabinets, which is worth building into your expectations.

After finishing and handover, the kitchen is ready to use.

Why timelines vary

Timelines vary with the size of the kitchen, the complexity of the design, the finishes and countertops chosen, the availability of appliances, and how many trades need to be coordinated. A clear plan with decisions made early is the most reliable way to keep a renovation on track.

Frequently asked questions

Can you guarantee an exact completion date?

No, and we'd be cautious of anyone who does. A realistic timeline accounts for manufacturing, trade coordination and countertop templating. We'll give you a clear sequence and keep you informed rather than a number that can't be honoured.

When do the countertops go in?

Usually after the cabinetry. Countertops are templated to the installed cabinets so the fit is exact, which means the counter stage follows the cabinet installation rather than running alongside it.

Tell us your target timing and your location, and we'll help you plan a realistic sequence for your kitchen.